Chance Technical Design Manual

CRAWL SPACE WALL

SEE TABLE FOR TOP & BOTTOM REINFORCING (SPLICE TOP AT MID-SPAN OF PILES; SPLICE BOTTOM OVER PILE)

SUPPORT TOP OF WALL WITH ADEQUATE ANCHOR BOLTS AND FRAMING

#4 @ 20” EACH FACE AS REQ.

BACKFILL

5’ MAX CRAWL SPACE

10” MIN

SEE TABLE FOR STIRRUPS (VERT. REINFORCEMENT)

FROST DEPTH +6” (MIN)

PERIMETER DRAIN

16” MIN

10”

4” VOID FORM UNDER FOOTING (EXPANSIVE SOILS ONLY)

CHANCE® HELICAL PILE

CRAWL SPACE WALL REINFORCING STEEL CONFIGURATION (SEE TABLE 4-10) FIGURE 4-11

18”

LOAD DETERMINATION

CRAWL SPACE WALL REINFORCING STEEL CONFIGURATION, TABLE 4-10

TOTAL FOUNDATION LINE LOAD

3,000 (lb/ft)

4,000 (lb/ft)

5,000 (lb/ft)

6,000 (lb/ft)

7,000 (lb/ft)

PILE SPACING

WALL HEIGHT

STEEL REINFORCING BARS REQUIRED

TOP & BOTTOM

STIRRUP (O.C.)

TOP & BOTTOM

STIRRUP (O.C.)

TOP & BOTTOM

STIRRUP (O.C.)

TOP & BOTTOM

STIRRUP (O.C.)

TOP & BOTTOM

STIRRUP (O.C.)

3’ 4’ 5’ 3’ 4’ 5’ 3’ 4’ 5’ 3’ 4’ 5’

2 - #5 2 - #4 2 - #4 2 - #6 2 - #5 2 - #5 2 - #7 2 - #6 2 - #6 2 - #8 2 - #8 2 - #7

2 - #6 2 - #5 2 - #4 2 - #7 2 - #6 2 - #5 2 - #7 2 - #7 2 - #7 4 - #6 2 - #8 2 - #8

2 - #6 2 - #6 2 - #5 2 - #7 2 - #7 2 - #6 2 - #8 2 - #8 2 - #7 4 - #7 4 - #6 4 - #7

2 - #7 2 - #6 2 - #5 2 - #8 2 - #8 2 - #7 4 - #6 4 - #6 2 - #8

2 - #7 2 - #7 2 - #6 2 - #8 2 - #8 2 - #7 4 - #7 2 - #8 4 - #6

8’

#3 @ 15”

#3 @ 15”

#3 @ 15”

#3 @ 15”

#3 @ 15”

10’

#3 @ 15”

#3 @ 15”

#3 @ 15”

#3 @ 15”

#3 @ 15”

12’

#3 @ 15”

#3 @ 15”

#3 @ 15”

#3 @ 15”

#3 @ 15”

4 - #8 #3 @ 11” 5 - #8 #3 @ 9”

15’

#3 @ 15”

#3 @ 15”

#3 @ 15”

4 - #7 4 - #7

4 - #8 4 - #7

#3 @ 15”

#3 @ 15”