Bonding and Grounding - Communication (CA12005E)
IntersystEM-Bonding
INTERSYSTEM-BONDING TERMINAL SERVICE DISCONNECT BOX CONNECTOR
NEC ® Section 250.94 Requirements
C
US
• An intersystEM-bonding termination for connecting intersystEM-bonding and grounding connectors required for other systems shall be provided external to enclosures at the service equipment and at the disconnecting means for any additional buildings or structures. • The intersystEM-bonding termination device shall not interfere with opening a service or metering equipment enclosure. • The intersystEM-bonding termination shall have the capacity for connection of not less than three intersystEM-bonding conductors.
LISTED 84D8
Features
• Can be used on galvanized steel or powder-coated steel • Becomes first choice for telephone, cable TV, or broadband
1. The service disconnect box connector is to be applied only to either side of the box, including both top and bottom of the box, never to the front. 2. Position the connector at a of the clamp (without the bolt) between the weld points and tap the wedge into place, using a small hammer. 3. Insert the bolt into the clamp threads and turn clockwise. Tighten to 20 in-lb. 4. Secure ground wire in appropriate hole. 5. This device can be used with solid and stranded 6–14 AWG copper ground conductors. side of the service disconnect box. Insert the pointed part
GROUNDING
BONDING &
Ordering information
EM-SDS-SUB-3 – Service Disconnect Box Connector
For Electric Motion Company (EMC) part numbers starting with “EM” please contact EMC customer service at 860-379-8515 or cs110@hubbell.com