Transmission Connectors - Assemblies (TH)

EHV Tangent Suspension, 3-Bundle Conductor V-String 50k lb Assembly, 345kV - 500kV

ASSEMBLY TAT32

Ø.75

0.88

1

3.50

Ø1.25 Lifting Hole

2

24.00

Inclusion of Ring Based on Voltage

45.0˚

3

Section Length

4

2.88

18.00

11.83

11.10

18.00

18.00

5

7

Clamp Assembly Length

6

Conductor Configuration

Base Assembly Bill of Material

Item Part Number

Description

Quantity

Material

UBS lb 60,000 60,000

1 2 3 4 5 6 7

AS50BNK HOO5024 See Chart SYC50SN

Anchor Shackle

2 2 2 2 1 3 3

Forged Steel Forged Steel

Oval Eye Ext. Link (24") Insulator, ANSI 52-11

Polymer

Socket Y-Clevis

Ductile Iron

50,000 50,000

H 33

YPT5012512

Yoke Plate

Galvanized Steel

See Note 1 See Note 2

Suspension Clamp w/Y-Clevis Eye

Aluminum Aluminum

— —

Armor Rods

Typical Insulator Selection

Line Voltage (kV)

Quadri*Sil® Part Number

Section Length Inches

SML lb

Corona Ring

345

S050103S201B

117.8

50,000

12”Line End 15”Line End 8”Ground End

500

S050155S201D

169.6

50,000

NOTE: For quoting/ordering instructions, see Assemblies section. (1) See Suspension Clamp section for standard and high temperature conductor suspension clamp options. (2) See Armor Rod section for rod set based on conductor application.

September 2017

Made with FlippingBook flipbook maker