Transmission Connectors - Assemblies (TH)

EHV Tangent Suspension, 3-Bundle Conductor V-String 30k lb Assembly, 345kV - 500kV

ASSEMBLY TAT32

0.88

Ø.63

1

2

Ø1.25 Lifting Hole

2.78

50˚

24.00

3

Inclusion of Ring Based on Voltage

5

4

Section Length

2.75

18.00

12.64

11.06

18.00

18.00

6

Conductor Configuration

Clamp Assembly Length

7

Base Assembly Bill of Material

Item Part Number

Description

Quantity

Material

UBS lb

1 2 3 4 5 6 7

AS25LBNK HOO3024 See Chart SYC30SN

Anchor Shackle

2 2 2 2 1 3 3

Forged Steel Forged Steel

30,000 30,000

Oval Eye Ext. Link (24") Insulator, ANSI 52-5

Polymer

Socket Y-Clevis

Ductile Iron Ductile Iron Aluminum Aluminum

30,000 40,000

YPT40236673

Yoke Plate

H 32

See Note 1 See Note 2

Suspension Clamp w/Y-Clevis Eye

— —

Armor Rods

Typical Insulator Selection

Line Voltage (kV)

Quadri*Sil® Part Number

Section Length Inches

SML lb

Corona Ring

345

S030103S201B

115.3

50,000

12”Line End 15”Line End 8”Ground End

500

S030155S201D

167.2

50,000

NOTE: For quoting/ordering instructions, see Assemblies section. (1) See Suspension Clamp section for standard and high temperature conductor suspension clamp options. (2) See Armor Rod section for rod set based on conductor application.

September 2017

Made with FlippingBook flipbook maker