Transmission And Substation Foundations - Technical Design Manual
SECTION 7: DESIGN EXAMPLES
Design Example 3
A.B. Chance SS176 PULLDOWN(R) Micropile Installation Torque vs. Required Pile Length
45
Torque and Pile Length Required to Achieve 85 kip Ultimate Load
40
Based on 6” Diameter Grout Column Providing .242 kip per Foot Friction Capacity
35
THORQUE VS. DEPTH
30
Pile Length (ft)
25
7677
7777
7877
7977
8077
8177
8277
I nIsntsatl al al ltai ot ino nToTroqruqeu e( f (t -f tl b- l)b )
Torque vs. Required Length Figure 7 -13
A pile layout for this design is included in Figure 7-14.
7-16 | www.hubbell.com/hubbellpowersystems
Made with FlippingBook - Online catalogs