WARNING! THE DESIGNER MUST APPLY A FACTOR OF SAFETY TO THE MAXIMUM FREE SPAN WHEN PLANNING THE UNDERPINNING DESIGN SO BEAM FAILURE IS NOT EXPERIENCED.
8” THICK REINFORCED CONCRETE SPREAD FOOTING MAXIMUM FREE SPANS, TABLE 4-7 8” THICK X 16”
BUILDING LINE LOAD (lb/ft) 1,500 2,000 2,500 3,000 3,500 4,000 4,500 5,000 5,500 6,000 6,500 7,000 MAXIMUM FREE SPAN BETWEEN SUPPORTS
SPREAD FOOTING (SEE FIGURE 4-8)
2 - #4 rebars (Gr 60); concrete block or cast stem wall (not dowelled) d = 5” 2 - #4 rebars (Gr 60); 8” x 12” tall cast stem wall (dowelled or monolithic) d = 17” 2 - #4 rebars (Gr 60); 8” x 18” tall cast stem wall (dowelled or monolithic) d = 23” 2 - #4 rebars (Gr 60); 8” x 24” tall cast stem wall (dowelled or monolithic) d = 29” 2 - #4 rebars (Gr 60); 8” x 48” tall cast stem wall (dowelled or monolithic) d = 53”
4’-6” 3’-9” 3’-6”
–
–
–
–
–
–
–
–
–
7’-7” 6’-6” 5’-10” 5’-4” 4’-11” 4’-7” 4’-4” 4’-2” 3’-11” 3’-9” 3’-8” 3’-5”
– 7’-7” 6’-10” 6’-2” 5’-9” 5’-5” 5’-1” 4’-10” 4’-7” 4’-5” 4’-3” 4’-1”
– 8’-6” 7’-8”
7’
6’-5”
6’
5’-8” 5’-5” 5’-2” 4’-11” 4’-9” 4’-7”
–
–
–
–
– 8’-2” 7’-8” 7’-4”
7’
6’-8” 6’-5” 6’-2”
12” THICK REINFORCED CONCRETE SPREAD FOOTING MAXIMUM FREE SPANS, TABLE 4-8 12” THICK X 24”
BUILDING LINE LOAD (lb/ft) 3,500 4,000 4,500 5,000 5,500 6,000 6,500 7,000 7,500 8,000 8,500 9,000 MAXIMUM FREE SPAN BETWEEN SUPPORTS
SPREAD FOOTING (SEE FIGURE 4-9)
LOAD DETERMINATION
3 - #5 rebars (Gr 60); 10” x 12” tall cast stem wall (dowelled or monolithic) d = 21” 3 - #5 rebars (Gr 60); 10” x 18” tall cast stem wall (dowelled or monolithic) d = 27” 3 - #5 rebars (Gr 60); 10” x 24” tall cast stem wall (dowelled or monolithic) d = 33”
8’-4” 7’-10” 7’-2”
7’
6’-8” 6’-5” 6’-2” 5’-11” 5’-9” 5’-7” 5’-5” 5’-3”
–
– 8’-5”
8’
7’-7” 7’-3”
7’
6’-9” 6’-6” 6’-4” 6’-1” 5’-11”
–
–
–
–
–
8’
7’-9” 7’-5” 7’-2”
7’
6’-9” 6’-7”
MONOLITHIC REINFORCED CONCRETE GRADE BEAM FOOTING MAXIMUM FREE SPANS, TABLE 4-9 TURNED DOWN FOUNDATION CONSTRUCTION (SEE FIGURE 4-10) BUILDING LINE LOAD (lb/ft)
1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 5,000 5,500 6,000 6,500 MAXIMUM FREE SPAN BETWEEN SUPPORTS
12” high perimeter beam; 2 - #4 bottom rebars (Gr 60) d = 9”
6’-9” 5’-6” 4’-9” 4’-3” 3’-11” 3’-7”
–
–
–
–
–
–
20” high perimeter beam; 2 - #5 bottom rebars (Gr 60) d = 17”
– – 8’-2” 7’-5” 6’-8” 6’-2” 5’-9” 5’-6” 5’-2” 4’-11” 4’-9” 4’-6”
24” high perimeter beam; 2 - #5 bottom rebars (Gr 60) d = 21”
–
–
–
8’-1” 7’-5” 6’-10” 6’-5” 6’-1” 5’-9” 5’-6” 5’-3”
5’
WARNING! THE DESIGNER MUST APPLY A FACTOR OF SAFETY TO THE MAXIMUM FREE SPAN WHEN PLANNING THE UNDERPINNING DESIGN SO BEAM FAILURE IS NOT EXPERIENCED.
Hubbell Power Systems, Inc. | All Rights Reserved | Copyright © 2023 | Page 4-11